read
write
members
about
account

 

datedatememberrandomsearch

February 22, 2011
The builders arrived at the start of this week and set to work, repairing the ceiling. They stuck large rectangular boards over the whole area, and then applied an even coat of plaster, which is now being left to dry out over a couple of days. It is a very high ceiling, so they had to erect scaffolding to stand on, while doing the plastering. I was stuck in the back room, and had to snake my way between the wooden planks and metal supports, if I needed to go out. But it was a productive time for doing stuff.